ShrinkMaster was involved in the total revamp project on Aucklands George street. Not only did we wrap the scaffolding structure around the perimeter of the building we designed, we installed a pvc frame that we usally used for our marine applications. The reason for this was so that new concrete could be poured during the rain with no delays what so ever.