In 2013 the HMS Wellington needed to have precision metal work done to its canons.  ShrinkMaster was called upon to provide the encapsulation of the work area, due to the nature of the work it was vital that the temperature was controlled to ensure the parts were fitted accurately.  The shrink wrap structure we installed was a mitigating factor in the accuracy and success of the installation of the new canon.